Technical guarantee measures of steel structure workshop engineering
release time:2019/4/25 23:38:33      hit count:2192

Technical guarantee measures of steel structure workshop engineering

In order to ensure that the fabrication and installation of your steel structure meet the established standards, the following measures are hereby formulated:

1, in strict accordance with the "steel structure engineering construction and acceptance code" gb50205-2001 provisions of the material, line, material, group, welding technical requirements for the steel structure production, hoisting.

2, roof support, steel beam roof beam and other components according to 1:1 lofting, blanking, and considering the contraction of the weld.

3. H-shaped steel group vertical welding machine, submerged arc welding machine, h-shaped steel rectification machine, leveller and other equipment are used for processing, welding and rectification of h-shaped steel group.

4. The friction contact surface of components shall be constructed in accordance with the reasonable construction process. After treatment, the friction surface of components shall not be painted or defaced. The friction coefficient test adopts bolt specimen. The friction treatment, material, high-strength bolt and component are the same, and the friction coefficient is 0.45.

5. The bolt connection hole shall be drilled by CNC drilling machine and its pass rate shall be checked.

6. Pre-assembly of components before leaving the factory, and record the assembly.

7. Hoist steel column and other vertical long-shaped members with the lifting point at 2/3 of the column length. Hoisting roof truss beam and other components, the lifting point is set at equal distance from the key position.

8. Pay attention to the influence of wind force, sunshine temperature and temperature difference during alignment correction of steel column. Therefore, no correction shall be made when the wind force exceeds level 5. Install or reinforce the side beams of the corrected columns immediately. Calibration should be carried out in the morning or when the sun is cooler and in the environment.

9, the production of glass commissioned professional glass manufacturers production and processing. The production of glass shall be in accordance with the current national standards and specifications, and the owner shall confirm the product samples, and provide relevant test reports and supporting documents.

Before the installation of steel structure, the foundation shall be retested to ensure that it meets the installation requirements. During the installation of steel structure, the measurement and correction shall be carried out and the error shall be controlled within the allowed range.

11. Carry out a comprehensive self-correction and self-inspection in accordance with the installation manual and acceptance standards to prevent errors in the work. The quality inspector should make a detailed inspection and record of the work every day, and check the quality together with the owner's representative and on-site project supervisor.

12. Check the material and quality guarantee of the steel. The quality guarantee shall mainly pay attention to the data of yield point, cold bending, room temperature impact and carbon content.

13. Self-inspection and mutual inspection shall be carried out in the process of steel structure fabrication, and special inspection shall be carried out in strict accordance with the steel structure engineering quality inspection and evaluation standard gb50211-95.

18, h-shaped steel plate butt weld inspection, to meet the second-grade weld quality standards.

19. Code for construction and acceptance of steel structure: pay attention to the protection of finished product paint and deformation during transportation. The components are tied firmly, and the binding place is protected by rubber pad to avoid damage of ring paint. And according to the shape of transport vehicles, components of the production of supporting transport frame to prevent deformation.

20. Check the matching conditions of the column foundation axis, the column foot bolts and the bolt holes on the column bottom plate before lifting.

21. After hoisting the steel column, the surveyor shall timely measure, correct and prepare for hoisting the roof truss beam.


News you are interested in
Previous:Jiangsu steel structure development direction of four major advantages
Next:Construction technology of steel structure engineering

Back to list

主站蜘蛛池模板: 国产二区免费| 亚洲伊人久久影院| 欧美日韩亚洲另类| 国产在线观看免费麻豆| 国产人成看黄久久久久久久久| 中文字幕欧美一区二区三区 | 狠狠插狠狠插| 中文字幕a一二三在线| 日本一区免费视频| 国产一区免费在线观看| 久久婷婷国产香蕉| 国产高清一区二区在线观看| 国产精品刺激对白麻豆99| 午夜精品99| 亚洲国产精品网站| 国产一区正在播放| 日韩亚洲欧美一区二区 | 欧美日韩激情一区| 国产亚洲精品久久19p| 国产一级一片免费播放| 欧美日韩激情在线| 欧美日韩国产在线一区二区三区| 一区二区三区国产精华| 亚洲国产精品一区在线观看| 91精品福利在线| 日本精品视频一区二区三区| 年轻bbwwbbww高潮| 国产精品九九九九九| 免费看片一区二区三区| 国产精品国外精品| 欧美一区二区三区黄| 精品国产91久久久久久久 | 中文字幕日韩有码| 久久久久亚洲国产精品| 在线国产一区二区| 日韩av免费网站| 国产欧美一区二区在线| 欧美一区二区伦理片| 日韩精品少妇一区二区在线看| 夜夜躁日日躁狠狠久久av| 激情久久一区二区三区| 久久99精品国产麻豆婷婷洗澡| 免费a级毛片18以上观看精品| 午夜影院啪啪| 久久精品国产一区二区三区不卡| 国产精品久久人人做人人爽| 国产视频一区二区在线播放| 日本xxxxxxxxx68护士| 狠狠躁夜夜躁| 亚洲一区欧美| 免费**毛片| 日韩av在线网址| 99国产超薄丝袜足j在线观看| 日韩一级精品视频在线观看| 99国产精品9| 国产一区二区三区黄| 日韩午夜电影院| 午夜电影院理论片做爰| 国语对白老女人一级hd| 99国产精品免费观看视频re| 91精品丝袜国产高跟在线| 国产精品一区二区在线观看免费 | 国产欧美综合一区| 99re国产精品视频| 欧美一区二区三区四区在线观看| 亚洲乱亚洲乱妇50p| 91麻豆精品国产91久久久更新资源速度超快 | 制服丝袜二区| 国产1区2区视频| 亚洲欧美国产日韩综合| 中文字幕欧美另类精品亚洲| 国产特级淫片免费看| 欧美亚洲精品一区二区三区| 美女直播一区二区三区| 69xx国产| 亚洲国产精品97久久无色| 91久久国产露脸精品国产| 国内少妇偷人精品视频免费| 日韩亚洲精品视频| 国产精品一区二区中文字幕| 国产在线一卡二卡| 国产欧美一区二区在线|